| Included
here are three animations and four time-lapse videos
to help demonstrate to you a selection of Nuttall John
Martin's capabilities. Click the appropriate still to
the right to launch the respective film in Flash.
If you have difficulties with viewing any of these,
please contact
us and request a CD-ROM by post.
1. Limpet Dam (5.5MB)
Watch an animation of the specialist
seal mechanisms required to adapt the Limpet Dam seals
to variably driven sheet piles.
2. Stornoway Dam (7.5MB)
Watch an animation of a Limpet
dam being installed and drained.
3. Saltburn Pier (3.5MB)
Watch an animation of how we
restored the 130 year old pier on the exposed North
East coast of England. The works included the replacement
of pile foundations, refurbishment of original metalwork
and the construction and replacement of hardwood prefabricated
deck sections.
4. Ipswich Roll On Roll Off
Linkspan (778KB)
A short 30 second time lapse
video showing the construction of a new 150-m long quay
wall and the positioning of a hydraulically operated
linkspan.
5. Widford Viaduct camera angle
1 (3.2MB)
This 3 minute time lapse video
shows the strengthening of the existing Widford Viaduct
by infilling and replacement of the existing three span
Railway Bridge with a single span bridge.
6. Widford viaduct camera angle
2 (3.2MB)
This video exhibits the same
project as Widford Viaduct camera angle 1, however the
time lapse camera is set up in a different position
enabling the viewer to gain a different perception of
the works carried out.
7. Liverpool Lock Gate Removal
(2.8MB)
Watch a 30 second time lapse
of the Liverpool Canada Dock Gate removal. This amazing
footage captures the lift and maneuvering of the gigantic
lock gate out of the River Mersey and on to a specially
drafted in barge.
|